Beta: inspections are saved in Team MEM (SharePoint). They are not sent to Fulcrum yet.
New asset inspection
Fields marked * are required. The orange solar sections appear when you pick a solar sub-type under VBIS.
Submitted inspections
Your inspections, newest first.
Where it is saved
When you press Save inspection, the form goes to the Team MEM - Fulcrum inspections flow, which saves it on the private Team MEM Activity SharePoint site:
- List "Team MEM Fulcrum Inspections": one row per inspection, reference TM-FI-0001 and up. It holds the location, the location pin (latitude, longitude, accuracy, how it was captured and when), the VBIS classification, every asset and solar answer, who saved it and when. Status starts as Submitted.
- List "Team MEM Fulcrum Inspection Parts": one row for each MPPT and each control system added under an inverter, linked to its inspection.
- Document library "Fulcrum Photos": the asset and data plate photos, named with the reference and tagged FI-<number>.
- Email: you get a confirmation with the reference.
Press Edit on an inspection under Submitted to change it: answers, location pin, MPPTs, control systems and photos (you can remove photos and add more). You can edit it while its status is Submitted.
You see your own inspections under Submitted. TeamMEM Full and Service Manager members can switch to everyone's.
The WiFi password is saved with the rest of the inspection. Sending inspections on to Fulcrum comes later.